Planning, Design & Construction

Bid Opening Alert

Bid opening will be delayed for 24 hours if Campus is under Remote Operations at 8:00 am on day of bid opening.
Check campus status at https://mualert.missouri.edu

ALERT: New projects will bid through the UMSystem Unity Construct website. Both Projex4 and Unity Construct Advertisement sites are active.
For construction projects listed in Unity Construct: https://www.umsystem.edu/ums/fa/facilities/construction-bids

Advertisements (Current, Upcoming, and Recent)

Request for Qualifications

Project Name (Project#) Pre-bid Meeting Date Due Date
None at this time.

Design/Bid/Build

The following is a list of construction projects out for bid. Click for project information.

Project Name (Project#) Prebid Meeting Date Bid Open Date
No Projects currently out for Bid.

Construction Manager at Risk

The following is a list of Construction Manager at Risk projects out for bid.

Project Name (Project#) Advertisement Date Pre-Bid Meeting
Date
Bid Due Date
Memorial Stadium - Improvements (CP241931)
  • FFE Package
11/25/2025 12/3/2025@ 11:00am
12/11/2025 - 1:30pm
The Whiting-Turner Contracting Company Public Plan Room
 

Recently Opened Bids

The following is a list of bid projects opened in the last 30 days. Awarded contracts will appear in the "Recently Awarded Contracts" section

Project Name (Project #) Date
Bid
Opened
Bid
Tabulation
Memorial Stadium Facilities — Concourse Restroom & Concession Stand Upgrades (CP241935) 11/18/2025

Recently Awarded Contracts

The following is a list of recently awarded construction projects.

Project Name (Project #) Date
Contract
Awarded
Contract Awarded To Amount Awarded
Memorial Stadium Facilities — Concourse Restroom & Concession Stand Upgrades (CP241935) 11/24/2025 Arete Contracting $3,757,304.00
Memorial Stadium Facilities — SEZ Recruiting Room Fitout (CP241934) 11/21/2025 FIVE OAKS ASSOCIATES $934,000.00
Memorial Stadium — West Bleachers Improvements - Renovations (CP262031) 11/21/2025 WESTERN SPECIALTY CONTRACTORS $1,784,784.00
Memorial Stadium — Sideline Power Installation (CP262051) 11/05/2025 REINHOLD ELECTRIC, INC. $320,800.00
General Site — Champions Drive Substation 69kV Transformer Foundations (CP231546) 10/29/2025 Reinhardt Construction, LLC $799,900.00
Walton Stadium — Track & Soccer Surface Upgrade (CP252172) 10/17/2025 Reinhardt Construction, LLC $5,204,500.00

Projects in Design

The following is a list of future construction projects.

Project Number, Title, and Scope
Est. Ad
Date
Est. Bid
Open
Date
Various Locations - Hatch & Schurz Hall Tuck Pointing (CP252341) Parapet repairs at Hatch and Schurz Halls to include re-pointing all joints at the stone coping and stone parapet panels with new raked mortar and sealant joints. Repair/replacement of existing damaged brick and stone masonry. General masonry re-pointing. Replacement of sealant and backing materials at the existing through-wall flashing from the roof deck elevation and up as well as existing control joints at the parapets. Clean and seal the existing stone coping. Base Estimate & Alternates: 428,562.00 12/15/2025 01/22/2026
Various Locations - Roof Replacement (CP252841) Replace the roofs of the 1923 & 1955 buildings of the Power Plant. Work to include replacing all the wood substrate as an add/alternate to the project. Reference the study project CP242431. Base Estimate & Alternates: 793,619.80 12/15/2025 01/20/2026
Bingham Hall - Update Courtyard Area (CP231011) The 2023 IAA study, driven by deferred maintenance at Bingham Courtyard, resulted in multi-stakeholder funding sufficient to support a full renovation, improving access and fostering meaningful student engagement and flexible event programming. Base Estimate & Alternates: 2,856,164.00 12/22/2025 01/15/2026
Lewis and Clark Halls - Electrical Service Panel Replacements (CP241511) Replace the service entrance electrical distribution panels. Base Estimate & Alternates: 1,560,000.00 01/06/2026 02/12/2026
General Site - Steam and Water Lines Replacement, Stephens and Lefevre Halls (CP253171) Replace steam condensate near Stephens and Schweitzer and replace water lines near Waters and Lefevre. Base Estimate & Alternates: 2,142,538.00 01/07/2026 01/22/2026
General Site - Electric and Steam Manholes Concrete Repairs (CP253191) Perform concrete structural repairs in electric and steam manholes. Base Estimate & Alternates: 325,000.00 01/08/2026 01/22/2026
MU Research Reactor - Installed Exhaust Ductwork Reconfiguration (CP253041) Reconfigure the installed exhaust ductwork to comply with ANSI standards for Stack Monitor installation. The exhaust ductwork installed during the construction of MURR West did not comply with the requirements of the ANSI standard for the sampling of exhaust. BFO Approval Attached Base Estimate & Alternates: 277,600.00 01/15/2026 02/05/2026
Tiger Avenue Parking Garage - Comprehensive Maintenance Repairs (CP252311) Perform Comprehensive Maintenance Repairs in Tiger Avenue Parking Structure. Base Estimate & Alternates: 4,551,000.00 02/03/2026 02/24/2026
Capital Region Parking Garage - Structural Repairs (CP262011) Engineering and construction needed to assess and rectify structural failures in the South Parking Garage. Engineer will need to phase the project in accordance with approved funding per fiscal year: FY26 - $750,000 FY27 - $975,000 FY28 - $975,000 Base Estimate & Alternates: 2,603,000.00 02/24/2026 03/17/2026
Memorial Student Union - Rooftop Duct Replacement (CP252991) Replace failing ductwork initially installed under CP151701 as a manufacturer warranty replacement effort. Base Estimate & Alternates: 180,000.00 03/26/2026 04/16/2026
Jesse Hall - First Floor Renovation (CP243351) Enhance the experience of visitors to campus and Jesse Hall by creating multimedia exhibits focusing on leadership development at Mizzou. These installations will occur in the south vestibule, main lobby, and east/west corridors. A new information desk will be constructed and glass doors will be installed. This is a donor-funded project. Base Estimate & Alternates: 2,100,000.00 04/06/2026 04/21/2026

Disclosure: This list is intended for information purposes only. This is not a complete list, nor is the information provided guaranteed to be correct. Stated dates are subject to change.

MCA (Master Construction Agreement) Projects in Design

The following is a list of projects being made available through Nabholz. If you are interested in any of these projects, please contact Garett Plotts with Nabholz at Garett.plotts@nabholz.com.

Project Number, Title, and Scope
Est. Ad
Date
Capital Region Medical Center - Replace Cooling Tower (CP262001) Replace existing cooling tower. Base Estimate & Alternates: 250,000.00 11/18/2025
Critical Care Addition - Heat Exchanger Replacement (CP262021) Replace two heat exchangers that serve the Critical Care Addition. Replacement includes relocation. Base Estimate & Alternates: 600,000.00 01/13/2026
Keene Street Medical Center - Pharmacy Renovation (CP252711) Update all items necessary to bring existing pharmacy up to USP 797/800 regulations. Base Estimate & Alternates: 416,570.00 01/27/2026